Week 4 To-Dos

  • Follow up with John about lally column replacement
  • Investigate what a meter setting is?
  • Plan plumbing system, order parts
  • Remove trimwork, label, and preserve in the house
  • Demo: Closets on 2nd floor
  • Buy windows from Home Depot or Amazon (1st floor addition + gable vent)
  • Build support temp wall in basement and move jacks
  • Inspect interior doors and save hardware
  • Gather lumber quotes
  • Demo: flooring in addition to build walls
  • Demo: hole for new window – if we have a window
  • Move mechanicals for pocket door frame; rough hole for pocket door
  • Finalize kitchen layout plans
  • Plan wiring, order parts
  • Clean moldy parts of basement with bleach
  • Clean and de-spider basement
  • Pay for roofing invoice
  • Remove hot water heater
  • Patch basement walls
  • Clean bedroom walls
  • Decide attic access plan
  • Patch drywall throughout the house
  • Trench NW gutter
  • Emily yanks all the garbage off our house! (with a ladder)

 

 

Advertisements

About Nathan

Originally from central Florida (near Orlando), I've lived in the Cleveland area since 2008. When I'm not caught up in the life project de jure, I paint, sculpt, play games (mostly board games and video games), and run a small hobby import/export business.

One thought on “Week 4 To-Dos

Comment

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s