Week 13+14 To-Dos

  • Clean and de-spider basement
  • Continue patching drywall throughout the house
  • Decide on master bedroom window
  • Continue patching basement walls and prep for Drylock
  • Installing PEX system
  • Work to execute a water meter install plan
  • Finish drainage/sewer system
  • Add insulation as needed
  • Prep walls for drywalling
  • Finalize shower designs and finish framing shower
  • Lay subfloor in laundry room
  • Lay subfloor in bathroom
  • Lay subfloor in pantry
  • Close old dryer vent
  • Install washer box in laundry room
  • Finish Building up masonary wall in crypt
  • Drylock basement walls
  • Frame Master Bedroom Closet
  • Frame Master Bedroom walls
  • Shore up rafters in Master Bedroom
  • Install wiring master bedroom
  • Replace removed drywall
  • Finish repairing and refinishing chimney
  • Decide/order flooring for Kitchen, bathroom, and laundry room
  • Set up appointment for insulation install
Advertisements

About Nathan

Originally from central Florida (near Orlando), I've lived in the Cleveland area since 2008. When I'm not caught up in the life project de jure, I paint, sculpt, play games (mostly board games and video games), and run a small hobby import/export business.

Comment

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s